Building Construction Stage Continues

Building Construction Stage 

June 11, 2020

With the foundation beams now completed, a filling has started to enable the crane to climb on the bottom floor and start erecting the steel structure sometime next week.

The Scout Foundation continues to provide employment during these hard times caused by COVID19.

These are exciting days for us as we move forward with this project of building a permanent home for the Scouts of Belize. Francis Woods (Cisco) thanks for doing such a fantastic supervison on the construction of the building.

Photos by: Alejandro Tovar & Hilberto B. Riverol

Building Construction Stage Continues

Building Construction Stage

June 6, 2020 Post files

And so it was that on June 6, 2020 the last section of the foundation beam was completed along with the driveway for the parking of vehicles.

Shortly filling of the inside of the foundation will be done to allow the movement of the crane while erecting the building structure.

The Belize Scout Foundation at work securing a permanent home for the Scouts of Belize.

Photo credits: Alejandro Tovar, Francis Woods and Hilberto B. Riverol