The flooring is being prepared for castingAdmin2020-08-06Uncategorized This is where the construction is at the moment. The flooring is being prepared for casting with concrete. August 4, 2020 Our concrete blocks campaign CONTINUES Previous Post Blocks Campaign for the "Sir Colville N. Young Building" Next Post Belize Scout Foundation (BSF) donates $6,000.00